Attached three-bay four-storey over basement premises, built 1763. The project was material change of use from office back to family dwelling. The major issue was that the 1763 design could not meet the 2020 building regulations, as such additional active measures were needed to provide an equivalent level of Fire Safety. Lenny acted at the lead Fire Safety Designer throughout the project.